We are digging along to an old pipe laid about 20 years ago. It needs to be re-laid as it runs six centimeters up hill. Not serious. Our new pipes are carefully laid up to this point and are running full. 

The old pipe was and is delivering sufficient water to the village.

We will make an access point here.
 Wet and muddy. I am in the ditch and Errol is on the bank.
 Passing the mud container.
 Passing out the mud container. !
 Errol in and David out. !
Errol and Lukas passing drain cleaning rods through the old pipe. Dashinka watching. !
 Errol pushing the cleaning rods through the pipe.
 